Subject Re: beginappend() Problem Fixed
From Tom <IHaveNoEmail@ddress>
Date Mon, 10 Jul 2023 15:40:36 -0400
Newsgroups dbase.getting-started

On 7/10/23 7:56 AM, Mervyn Bick wrote:
> snip
> Load shedding in Johannesburg is allocated in 2hour slots plus 30
> minutes to allow for staggered reconnection.  Once level 5 is reached
> consecutive slots can be allocated resulting in a 4hour period without
> power.  Instead of simply displaying the individual 2hour slots it makes
> a more meaningful display to show the actual periods power will be off
> with start and stop times.  Screenshot attached.  To do this in dBASE
> would mean creating a temporary table or perhaps an arrrayRowset each
> time.  With Firebird a stored procedure that accepts a date and a level
> does the job.
>
> snip

Hi Mervyn,

Out of curiosity, I notice on your chart there are several examples
where power off times overlap. Is this correct?

Lower chart:
Monday:
Line 2:
Power off 6:00 to 8:30 am
Next line down:
Power off 8:00 to 10:30 am

Must be really dark between 8:00 and 8:30 am :-)

Tom