| Subject |
Re: beginappend() Problem Fixed |
| From |
Tom <IHaveNoEmail@ddress> |
| Date |
Mon, 10 Jul 2023 15:40:36 -0400 |
| Newsgroups |
dbase.getting-started |
On 7/10/23 7:56 AM, Mervyn Bick wrote:
> snip
> Load shedding in Johannesburg is allocated in 2hour slots plus 30
> minutes to allow for staggered reconnection. Once level 5 is reached
> consecutive slots can be allocated resulting in a 4hour period without
> power. Instead of simply displaying the individual 2hour slots it makes
> a more meaningful display to show the actual periods power will be off
> with start and stop times. Screenshot attached. To do this in dBASE
> would mean creating a temporary table or perhaps an arrrayRowset each
> time. With Firebird a stored procedure that accepts a date and a level
> does the job.
>
> snip
Hi Mervyn,
Out of curiosity, I notice on your chart there are several examples
where power off times overlap. Is this correct?
Lower chart:
Monday:
Line 2:
Power off 6:00 to 8:30 am
Next line down:
Power off 8:00 to 10:30 am
Must be really dark between 8:00 and 8:30 am :-)
Tom
|
|